Journal of System Simulation
Abstract
Abstract: By establishing the dynamic mapping relationship between the set of the construction state and the set of the emulation state of numerical simulation model, the method of three dimension and full-scale dynamic simulation for structure safety and schedule coupling during construction process was built. The method was used to dynamically analyze structure safety under any construction schedule condition of dam. VTK was utilized to realize three dimension and full-scale dynamic visualization for structure safety and schedule status coupling of RCC gravity dam during construction process. A three dimension and full-scale dynamic simulation and visualization system for structure safety and schedule coupling of RCC gravity dam was developed with C#.Net and APDL. The system can quickly provide data support to comprehensive control of structure safety and schedule during construction process.
Recommended Citation
Zhang, Sherong; Du, Chengbo; Sa, Wenqi; Wang, Gaohui; and Chao, Wang
(2020)
"Full-scale Dynamic Simulation for Structure Safety and Schedule Coupling of RCC Gravity Dams,"
Journal of System Simulation: Vol. 27:
Iss.
1, Article 7.
Available at:
https://dc-china-simulation.researchcommons.org/journal/vol27/iss1/7
First Page
57
Revised Date
2014-02-16
DOI Link
https://doi.org/
Last Page
62
CLC
TV642.2
Recommended Citation
Zhang Sherong, Du Chengbo, Sa Wenqi, Wang Gaohui, Wang Chao. Full-scale Dynamic Simulation for Structure Safety and Schedule Coupling of RCC Gravity Dams[J]. Journal of System Simulation, 2015, 27(1): 57-62.
Included in
Artificial Intelligence and Robotics Commons, Computer Engineering Commons, Numerical Analysis and Scientific Computing Commons, Operations Research, Systems Engineering and Industrial Engineering Commons, Systems Science Commons