Journal of System Simulation
Abstract
Abstract: In order to improve the integration and coordination of the weapon systems engineering and risk management, a new approach was proposed that integrated risk aspects with system analysis, modeling and design in weapon systems engineering. The approach established the lifecycle model of the weapon systems engineering to realize the risk identification and control in risk management based on OPM (Object-Process Methodology). V & V (verification and validation) was implemented to the OPM model by the simulation and execution progress, which significantly ensured the correctness and consistency of information and knowledge. It shows a case of UAV-based anti-missile defense system to demonstrate the effectiveness of this method.
Recommended Citation
Zhan, Zheng; Jian, Yao; Feng, Yang; and Wang, Wenguang
(2020)
"Research on Weapon System Design for Risk Management Based on Object-Process Methodology,"
Journal of System Simulation: Vol. 29:
Iss.
9, Article 17.
DOI: 10.16182/j.issn1004731x.joss.201709017
Available at:
https://dc-china-simulation.researchcommons.org/journal/vol29/iss9/17
First Page
2000
DOI Link
https://doi.org/10.16182/j.issn1004731x.joss.201709017
Last Page
2008
CLC
E917;E920
Recommended Citation
Zheng Zhan, Yao Jian, Yang Feng, Wang Wenguang. Research on Weapon System Design for Risk Management Based on Object-Process Methodology[J]. Journal of System Simulation, 2017, 29(9): 2000-2008.
DOI
10.16182/j.issn1004731x.joss.201709017
Included in
Artificial Intelligence and Robotics Commons, Computer Engineering Commons, Numerical Analysis and Scientific Computing Commons, Operations Research, Systems Engineering and Industrial Engineering Commons, Systems Science Commons