•  
  •  
 

Journal of System Simulation

Abstract

Abstract: Distributed job-shop production scheduling is the key to high efficient production. Preventive maintenance, an essential means to ensure the safety and reliability of equipment, should be the necessary content of the production decision-making. Aiming at the production delay caused by equipment maintenance, a simulation-corrected optimization method is proposed. The mathematical model and simulation model for the joint production and preventive maintenance scheduling are established. The sequence exchange-based genetic algorithm is combined with the simulation-corrected optimization method to form a fast simulation optimization scheme. Experimental results on typical cases show that the proposed simulation optimization method can improve the solution quality and robustness for the production process with uncertainty.

First Page

688

Revised Date

2022-03-10

Last Page

699

CLC

TP391.9

Recommended Citation

Fei Ye, Ziqing Li, Yuanjun Laili. Simulation Optimization on Joint Production and Preventive Maintenance Scheduling for Distributed Job-shop[J]. Journal of System Simulation, 2022, 34(4): 688-699.

Corresponding Author

Yuanjun Laili,lailiyuanjun@buaa.edu.cn

DOI

10.16182/j.issn1004731x.joss.21-1288

Share

COinS