Journal of System Simulation

Abstract

Abstract: The construction of high-filled loess project facessome engineering and technical challenges,such as large and complex earth excavation and earth backfilling operations. According to this situation, this paper presents a dynamic visualization methods for high-filled project based on 3D GIS. By establishing the model of high-filled loess, comparative analysis and visual analysis, dynamic simulation of high-filled loess project, visualization and analysis of Dig-Fill process and monitoring information arerealized. The results show that this visualization method can directly and accurately display the construction process, help decision makers master construction information and process.

First Page

2980

Last Page

2985

CLC

TP391.9

Recommended Citation

Zheng Liping, Chen Wei, Liao Ting, Lu Chang. Monitoring Information Visualization for High-filling Loess Project[J]. Journal of System Simulation, 2017, 29(12): 2980-2985.