Abstract: The construction of high-filled loess project facessome engineering and technical challenges,such as large and complex earth excavation and earth backfilling operations. According to this situation, this paper presents a dynamic visualization methods for high-filled project based on 3D GIS. By establishing the model of high-filled loess, comparative analysis and visual analysis, dynamic simulation of high-filled loess project, visualization and analysis of Dig-Fill process and monitoring information arerealized. The results show that this visualization method can directly and accurately display the construction process, help decision makers master construction information and process.
Recommended Citation
Zheng, Liping; Wei, Chen; Liao, Ting; and Chang, Lu
(2020)
"Monitoring Information Visualization for High-filling Loess Project,"
Journal of System Simulation: Vol. 29:
Iss.
12, Article 6.
DOI: 10.16182/j.issn1004731x.joss.201712006
Available at:
https://dc-china-simulation.researchcommons.org/journal/vol29/iss12/6
First Page
2980
DOI Link
https://doi.org/10.16182/j.issn1004731x.joss.201712006
Last Page
2985
CLC
TP391.9
Recommended Citation
Zheng Liping, Chen Wei, Liao Ting, Lu Chang. Monitoring Information Visualization for High-filling Loess Project[J]. Journal of System Simulation, 2017, 29(12): 2980-2985.
DOI
10.16182/j.issn1004731x.joss.201712006
Included in
Artificial Intelligence and Robotics Commons, Computer Engineering Commons, Numerical Analysis and Scientific Computing Commons, Operations Research, Systems Engineering and Industrial Engineering Commons, Systems Science Commons